| 1. | Application of water level measuring meters in hydraulic power station 水位测量仪表在水电站中的应用 |
| 2. | Disposal of landslide happened in the tunnel of yangxi hydraulic power station 乳源县杨溪水电站工程隧洞塌方处理 |
| 3. | Computer monitoring system operating analysis of longyangxia hydraulic power station 龙羊峡水电站计算机监控系统运行分析 |
| 4. | People came in flocks to see the new hydraulic power station beside the dam 人们成群结队地来参观水坝旁边新建的水电站。 |
| 5. | Design and research for concrete production system at right bank of longtan hydraulic power station 龙滩水电站右岸混凝土生产系统设计研究 |
| 6. | By the development of hydraulic power project , the system of hydraulic power station is more and more complex <中文摘要> =随着水电事业的发展,水电站系统变得越来越复杂。 |
| 7. | Large scale diversion tunnel is often adopted when building a hydraulic power station between high mountains or in canyons on a great river 在高山峡谷的大江大河上修建水电站,往往需要大尺度导流洞。 |
| 8. | Since first used in the wujiangdu hydraulic power station with success , high - pressure grouting ( orifice - closed grouting method ) spreads rapidly in the carst region and lots of experience are accumulated 高压灌浆(即孔口封闭灌浆法)自乌江渡电站首次采用并取得成功后,在岩溶地区得到了迅速的推广,集累了十分丰富的实践经验。 |
| 9. | Based on this method , design the system oil circuit and constant - pressure hydraulic power station as well as the hydraulic manifold block , measuring platform , electrical cabinet and reclaiming oil tank 在此油源方案的基础上,设计出测量系统油路、油源泵站系统,同时进行了液压集成块、测量台架、电气控制柜和漏油回收油箱的设计。 |
| 10. | However the diversion tunnel is generally discarded after used , because the construction period of hydraulic power station is pressing , the lining standard of tunnel needs being improved and the up and down steam water level is difficult to be joined 而导流洞在完成导流任务后,又往往因为工期紧,衬砌标准需提高,上下游水位衔接等困难而被废置不用。 |